Bioremediation Implementation Practices

A6. Biobarrier Installation and Management

Presentation Title

Author List

Format

Abstract or Paper PDF

Presentation PDF

EVO/Bioaugmentation for Treatment of Trichloroethene by Biobarrier and Source Injection ApproachB.P. Bakrania, C.A. Fogas, M.S. Kozar, and E.T. SchleicherPlatformViewView
Multiple Large-Scale Biobarriers for Multi-Contaminant, High-Concentration Plume in Brackish Water, Naval Air Station North IslandV. Hosangadi and M. PoundPlatformViewView
Field Application of Dual-Biofilm Barriers for In Situ Remediation of Chlorobenzenes in Groundwater and Wetland SedimentsA.R. Wadhawan, N.D. Durant, M.M. Lorah, S. Chow, and E.J. BouwerPlatformViewView
Denitrifying Permeable Reactive Barriers on Cape Cod: Bench-Scale Studies and Implementation of the First In Situ EVO PRBP.M. Dombrowski, M. Temple, M. Lee, D. Raymond, J. Begley, T. Parece, J. Marrion, B. Shreve, and F. HostropPlatformViewView
Modeling of Water Quality Downgradient of Mulch Biowall with Nearby Surface Water ReceptorM.L. Alexander, A. Adewale, and C. TovarPosterView 
Verification of Fracture Extent Using Surface Deformation DataB. Slack and L. MurdochPosterView 
Enhanced Anaerobic Biodegradation of Trichloroethene and Hexahydro-1,3,5-trinitro-1,3,5-triazine in a Commingled Source Area Using Permeable Reactive Barriers and Groundwater RecirculationS. Eichelberger and C. CranePosterView